SITE-SPECIFIC PERMITS

Meni Touris ak Kilti

Si pwodiksyon an bezwen sipò nan men lòt depatman sèvis vil la, w ap bezwen plis dokiman sipò, tankou sa ki annapre yo pou nou ka trete demann ou an:

  • Deskripsyon detaye sou aktivite yo ak aksè pou chak kote yo mande a.
  • Yon dyagram oswa yon plan sit pou zòn espesifik yo mande a, ki endike nenpòt gwo akseswa, konstriksyon dekor, oswa sipò plasman tant, dèlko, kablaj, restriksyon dwa pasaj, elatriye.
  • Yon delè detaye ki gen ladan lè chajman ak lè chajman soti.
  • Demann Aksè Plaj pou Veyikil (si sa aplikab)
  • Pou operasyon dron, tanpri al gade egzijans Pèmi Film & Enpresyon UAS/Dron nou yo ak Fòm Demann Filmaj FAA – UAS la.
  • Y ap bezwen eskòt PD pou tout pèmi espesifik pou sit la, tanpri mete demann pèsonèl la nan aplikasyon w lan.
  • If applicable, parking must be reserved with a minimum of 48 hours prior to the production start.
  • Notification / sign offs to the affected businesses must be completed with a minimum of 24 hours prior to the production start. In cases where the production has a large footprint, contact our office to coordinate.

Pou itilizasyon dèlko, tanpri bay:

  • Espesifikasyon mak/modèl/puisans jeneratè ki pral itilize a, kalite ak kantite gaz sou plato a, ak kote depo gaz siplemantè a ki gen ladan distans ak jeneratè a. Tanpri sonje, li obligatwa pou gen yon ekstengtè sou plas pou tout itilizasyon jeneratè ki apwouve.
  • Vi ayeryen plasman jeneratè a ak wout kablaj yo pwopoze a (tanpri endike sa nan plan/dyagram sit ou a).
  • Detay sekirite (Pa egzanp – èske gaz echapman yo a yon distans ki an sekirite ak piblik la, kenbe yon distans ki an sekirite ak pyebwa, kote ki fèmen, sab sab sou plaj la), epi kijan yo pral pwoteje câbles jeneratè yo kont piblik la pou mache oswa danje elektrik. Tanpri note, nenpòt câbles ki travèse yon dwa pasaj piblik (veyikil oswa pyeton) dwe kouvri ak kouvèti câbles ki konfòm ak ADA.
  • Bay enfòmasyon sou kijan pwodiksyon ou an planifye pou anpeche piblik la jwenn aksè nan dèlko a (distans, pasaj tep, kloti, elatriye).
  • Si w ap mete dèlko a sou oswa bò kote tè, zèb, oswa sab, tanpri bay detay sou kijan y ap pwoteje tè a kont debòdman gaz.
  • Tanpri endike sa dèlko a pral bay kouran (limyè, ekipman kamera, enstalasyon pou kwit manje, elatriye).

3. Apply For a Permit Online

Submit your print or film permit request using the Civic Access Online Portal. The link will take you directly to the Film and Print list of permits. Once on the portal you must either login to your account or sign up for a new account.

Please view the instructional video on this page detailing the process for locating all Film and Print permits, then proceed to register an account and submit your permit application. Ensure that you have the required Indemnity Agreement and Certificate of Insurance PDF documents prepared before initiating the permit application process, as outlined above.

Please note that the City of Miami Beach and the City of Miami are two separate cities. If you wish to apply for a permit for the City of Miami, for areas like Downtown Miami, Wynwood, Little Havana, Little Haiti, etc., please visit: Get a Film Permit - Miami

Permit Timelines

The City of Miami Beach offers complimentary permits! That’s right, free! We do not charge permit fees, square footage fees, usage fees, or any other fee. You only pay for what you use a la carte, like meter rentals, and off-duty officers.

Label

Permits are issued Monday through Friday 9 a.m. to 5 p.m.

The Film & Print Office works quickly and collaboratively to help support and expedite all of your production needs. We attempt to issue all permits within a few hours of all deliverables being submitted by the client. The more complex the permit request, the more time the client needs to complete the coordination.

Label

Label

Citywide permits average about 2 business days of coordination for first-time applicants.

but then can be pulled within a day. Larger permits that require police staffing and meter rental average 3 to 4 business days.

Label

2021-01-01

Any closures, driving shots, stunt work, drone work, and regular residential uses, 2 business days, 3 to 4 business days, around 7 business days

Of course, it is always best to err on the side of applying with as much time as possible, to give some leeway.

2021-01-01

All timelines are from complete delivery of all information/diagrams and materials needed to process permit.

Productions are encouraged to reach out in advance for general information if they are not familiar with the process

Best efforts will always be made to process requests in less time if possible, but no guarantee can be made.

Wherever one permit request triggers multiple categories, the longest lead time should apply.

*TIMELINES BELOW SHOULD BE STRONGLY ENFORCED DURING HIGH IMPACT PERIODS*

Site-Specific Public Property - Non-Exclusive Use Private Commercial Property 3 business days
Site-Specific Private Commercial Property 3 business days
Site-Specific Public Property - Non-Exclusive Use Private Commercial Property 3 business days
Site-Specific Residential (short term - during residential production hours, no high impact activities, does not trigger Internal Review) 5 business days
Site-Specific Residential (long term productions, outside of residential production hours, triggers Internal Review, high impact activities) 10 business days

Enfòmasyon sou biwo a:

Depatman Touris ak Kilti

Divizyon Evènman Espesyal ak Fim 

Divizyon Afè Kiltirèl

Abòne ak bilten nou yo!

htHT
Scroll to Top